Springdale, Arkansas

Metal Building Kits in Springdale, AR

A kit price and a finished building price are different numbers, sometimes by a very large margin. Knowing exactly where the line falls is the difference between a good decision and a bad surprise.

Where the kit ends and the project begins

The single most common frustration with kit buildings is not the kit. It is the discovery, after the kit price is accepted, of how much of the finished project sat outside it.

What is typically inside and outside a metal building kit price
Usually in the kitUsually not in the kit
Primary rigid framesFoundation design, footings and slab
Purlins, girts and bracingAnchor bolts and their placement
Roof and wall panels with trimSite access, unloading equipment and crane time
Framed openingsActual doors, windows and hardware
Fasteners and closuresInsulation and vapour control
Stamped structural drawingsGutters, downspouts and drainage
Erection labour, permits and inspections
Grading, utilities, drives and parking

How to compare kit quotes properly

Put every quote on the same basis before looking at the totals. Confirm the design loads used, the clear span and eave height, the panel gauge and finish warranty, which openings are framed, whether trim and closures are included, whether stamped drawings and an anchor bolt plan are included, and what the delivery assumption is. Two numbers that differ by twenty percent frequently describe buildings that differ by more than that.

When a kit is the right call

When you have competent erection lined up, a straightforward site, a simple building, and the time to manage the pieces that fall outside the kit. When any of those is missing, an erected or turnkey price is usually the better value even though the headline number is higher.

Ask for a quote both ways. The form below lets you request building only, or the building with concrete and site work included, so you can see the two numbers side by side rather than guessing at the gap.

What to send for a kit quote

  • Building dimensions and desired eave height
  • Whether you have erection lined up or need it quoted
  • Site access for delivery trucks and lifting equipment
  • Which openings you need framed and which doors you want supplied
  • Whether you need the foundation designed as well
  • Insulation, gutters and trim expectations

Frequently asked questions

What does a metal building kit price normally include?

Typically the primary frames, secondary framing, roof and wall panels, trim, fasteners, and stamped engineering drawings for the structure. It usually does not include the foundation, the anchor bolts, the slab, delivery to a difficult site, unloading equipment, erection labour, doors and windows beyond framed openings, insulation, gutters, permits or any site work.

So why do two kit quotes differ so much?

Almost always because they describe different buildings. Different design loads, different clear span, different panel gauge and finish warranty, framed openings included or not, trim packages, and whether stamped drawings and anchor bolt plans are part of the price. Comparing two kit numbers without comparing those items is not a comparison.

Can I erect a kit myself?

Some people do, on smaller buildings. Be realistic about what it requires: lifting equipment, fall protection, a crew that has done it before, and the schedule discipline to get a building dried in. Errors in anchor bolt placement or frame plumbing are difficult and expensive to correct once panels are on. For anything with a commercial occupancy or a long span, experienced erection is money well spent.

Does a kit still need engineering and permits in Springdale?

Yes. The building still has to satisfy the applicable code and the local review process regardless of how it was purchased. For commercial projects inside Springdale the City states that stamped structural steel plans must be approved and on site before structural steel erection, so the engineering package is not optional paperwork.